Clear answers

Answers given plainly, with the reasoning shown

What tolerance can you actually measure down to on the CMM?

In practice we hold roughly two micrometres on a good day in a controlled room, and we will tell you when a feature sits close to that limit rather than promising a figure the machine cannot repeat.

Do you collect parts or do we need to deliver them to you?

We do not run a collection round. Parts are delivered to our unit by the customer or their courier, and we will confirm receipt and log them onto the job the same day.

How long does a typical first article inspection take?

A straightforward part with thirty or forty features usually takes three to five working days from receipt. Complex parts with many positional callouts take longer, and we quote the lead time with the price.

What do we need to send with the parts for inspection?

Send the drawing at its current revision, any model file if you have one, and a note of which dimensions matter most to you. Without a clear revision we cannot report against it.

Are you able to inspect parts that have already been plated or coated?

Yes, though coating thickness changes the measured size and we report what the part actually is. If you need the pre-coat size confirmed, the inspection has to happen before finishing.

What does an inspection report from you actually contain?

Each report lists the feature, the nominal value, the tolerance band, the measured result and a pass or fail mark, along with the drawing revision and the equipment used.